Pilot proposal · October 2026 · for discussion

Derby Land Passport Living Lab

A proposed research collaboration between industry, the University of Derby and Derby City Council to test whether one traceable digital site record can reduce duplicated work, improve planning information and preserve knowledge throughout a building's life — starting with one real Derby site, evaluated independently, and designed to complement the city's existing Digital Twin.

Proposed research question

Can a persistent, source-traceable digital record reduce information loss and duplicated effort between land appraisal, planning consent, construction and property handover?

01 / Why now

National policy is moving towards digital property records.

The government's Home buying and selling reform roadmap (June 2026) supports digital property logbooks and sales packs, and HM Land Registry's Business Plan 2026+ commits to testing logbooks, common data standards and wider use of Unique Property Reference Numbers. Logbooks already exist for finished homes; Land Passport tests extending the record back to land appraisal and planning.

GOV.UK roadmap

82% support

82% of consultation responses agreed the government should support wider use of digital property logbooks and packs. The government intends to legislate to make them a standard part of transactions when parliamentary time allows; they are not yet mandatory.

Read the government's full reform roadmap ↗
From 2027

First requirements under consideration

From 2027 the government will consider which government homeownership schemes should require digital logbooks and packs. HM Land Registry will test new ways to access property information, including logbooks, with the Digital Property Market Steering Group.

HM Land Registry Business Plan 2026+ ↗

02 / Test-site options

Two ways to run the first pilot.

Both options use a real Derby site with a consenting owner or developer. They test different things, so partners can choose which leads and run the other as a separately scoped study.

Option A

City-centre site within the council's Digital Twin area

A development already subject to the council's 3D-model requirement, so the same model can serve the city twin and the site's passport.

What it tests

Interoperability with Derby's existing city twin; how submissions, revisions and approvals could be kept with the site.

Strengths

Strongest story for the council and the twin's provider; uses a workflow that already exists.

Challenges

More parties and approvals; model preparation and import costs are set case by case; agreement from Digital Urban needed before any integration is claimed; city-centre schemes are larger and slower.

Option B

5–20 homes within the city boundary, from raw land

A small residential site taken from first appraisal through planning, construction and handover.

What it tests

The full information chain on one manageable site, with a clear baseline for time saved and records kept.

Strengths

Simpler governance; one developer; easiest to measure; closest to the national logbook direction.

Challenges

May sit outside the city model's coverage; construction and occupation take longer than a research period, so the operational-life test uses an existing occupied building.

Suggested approach: agree the lead option with partners at scoping. If a suitable small residential site exists inside the Digital Twin area, it can combine the strengths of both.

03 / Record structure

One permanent site record, with linked child records.

A site rarely stays one thing: one parcel can become twelve plots, each with its own address, title and building. The passport keeps a permanent parent record so the land's history survives subdivision, sale and redevelopment.

UPRNHM Land Registry titlePlanning referenceBuilding control referenceEPC

Illustrative structure. The Land Passport ID is its own permanent identifier, linked to official identifiers rather than replacing them. Surveyed boundaries, title plans and GIS parcel outlines stay separate: title plans generally show general, not exact legal, boundaries.

04 / Data status

Every item says where it came from and how far to trust it.

Appearing in a passport does not make a document approved. Each item carries its source, date, responsible party and one of four status labels.

Verified

Confirmed against an authoritative source by a named, responsible party.

e.g. decision notice checked against the council's planning register

Imported

Taken from a stated source but not independently checked.

e.g. a developer's uploaded drawing; open planning data

Inferred

Calculated or predicted from other data — useful, but not official.

e.g. development scenario or uplift estimate — not a valuation

Simulated

Illustrative or demonstration data only.

e.g. the live twin feed on the briefing page

05 / Deliverables and acceptance criteria

What the pilot would deliver and how it would be judged.

Baselines are measured before the prototype is used. Thresholds below are proposals for the University to refine; results would be reported whether or not they are met.

MeasureBaseline methodProposed pass threshold
Information retrieval timeTime to find an agreed set of site documents and facts from current sourcesAt least 40% faster using the passport
Document completenessAgreed checklist of land, planning and design records for the siteAt least 90% of checklist items present, with gaps shown
Provenance accuracyIndependent audit sample of items100% carry source, date and status; audit error 5% or less
AuditabilityChange history reviewEvery change logged with who, when and why
UsabilityStandard System Usability Scale with officers, developer and researchersScore of 70 or more
Handover usefulnessStructured feedback from the developer and an occupier or asset managerMajority rate the record more useful than current handover

Deliverables: a working site passport with provenance, permissions and version history; an IFC model linked to the record; an evaluation report; and a short data specification others could reuse.

06 / Partner roles

Different reasons to take part.

University of DerbyDerby City Council
Main interestApplied research, knowledge exchange, publishable evidenceBetter planning information, efficiency, digital transformation
ContributionResearch design, ethics, methodology, independent evaluation, studentsWorkflow requirements, planning context, officer feedback
First stepResearch scoping and feasibility discussionExploratory meeting with planning and digital officers — no procurement or endorsement asked
Main constraintAcademic capacity and financingProcurement, security, capacity, public accountability
Later roleKTP or wider applied R&DFormal public-sector pilot, if value is shown

A developer or landowner provides the site, permitted drawings and reports, feedback and, ideally, a contribution to pilot costs. The Land Passport team provides the prototype and built-environment coordination. No organisation is an agreed participant yet.

07 / Roadmap

Prove one site before scaling.

PeriodDeliveryProof of progress
Oct – Nov 2026Refine the briefing; confirm the operating company; build one real, sourced site record from public dataWorking passport with provenance, permissions and version history
Nov 2026 – Jan 2027University scoping, council conversation, developer recruitment, KTP eligibility reviewResearch questions, pilot roles, outline budget and a suitable site
Feb – Apr 2027Build the land-to-planning prototype with public GIS and project recordsTestable end-to-end record, with missing information visible
May – Oct 2027Independent evaluation of planning and design workflows; IFC and document handover testsMeasured baseline-versus-prototype results
2028 onwardsPaid developer pilots, interoperability partnerships, asset-management featuresRepeatable product and data-governance arrangements

A new development will not complete planning, construction and years of occupation within a research period. The live site covers land and planning; an existing occupied building covers the operational-life test. Public data would start from the government's Planning Data platform and other licensed sources — not every council document, utility record or title is available through one API.

08 / Funding — realistic view

Where the money could come from, and the conditions.

ProgrammeOpportunityConditions
Innovate UK KTPRound 4 opens 19 Oct 2026, closes 20 Jan 2027. Illustrative total project cost ~£204k over 24 months.University-led; the company co-funds about a third (~£67k on that budget) and needs at least two full-time-equivalent staff, financial evidence and an IP agreement. Round 4 terms to be checked when published.
Geovation AcceleratorUp to £20k equity-free, with Ordnance Survey and HM Land Registry data and mentoring.Competitive; next application dates not yet confirmed.
PropTech Innovation FundMHCLG interest in planning technology; Round 6 shared £2.4m across 11 consortia.No new round confirmed; past rounds needed at least two planning authorities.
EMCCA Local Growth Fund£107m regional plan across several priorities.Not an open grant for this project — a route for strategic alignment.

The pilot does not depend on winning a KTP. The first steps are research interest, a small working demonstrator, one development partner and a check of company eligibility. No application has yet been made. Full funding register ↗

09 / Governance

Set out before any real data is used.

To be confirmed in a pilot agreement

  • Data controller and processor roles for each organisation and project (see the governance framework; intended operator: FOX Intelligence, to be confirmed)
  • Ownership of intellectual property and research outputs
  • Data custody, portability and continued access if a party withdraws
  • Information security and professional liability
  • Permissions for each record and each partner

Building safety records

The statutory "golden thread" under the Building Safety Act applies to higher-risk buildings. A typical 5–20 home scheme falls outside that regime; the pilot would apply the same principles — accurate, traceable, kept up to date — voluntarily.

Business model to test

A developer-funded creation fee plus ongoing record hosting and transfer, rather than asking councils or homeowners to fund a new service from the outset.

Start with one real site.

A 30-minute conversation to agree the lead option, the research questions and a realistic route to funding.

Request a scoping call →One-page briefing (PDF) ↓